Shayona-logo
Header_image-1

24/7
Customer Service

Header_image-2

TÜV SÜD ISO 9001:2015

Header_image-3

Qualified
Expert Professional

Process

Our Process

Lorem ipsum dolor sit amet. Sed minus neque et iste enim rem corrupti aliquam. Hic reiciendis rerum aut dolores.

Production Part Approval Process

Raw Material Recieving

Cutting

Heat Treatment

Forging

Heating

Short Blasting

Machining

Pre-Packaging Dispatch Inspaction

Short blasting

After Sales Support

Packaging & Shipping

01

Production Part Approval Process

02

R/M Material Recieving

Receiving Inspection: Visual inspection, Document Review, Chemical test, NDE(Sample), Mechanical Test(ifrequired), Grade Color Coding

03

Cutting

Cutting Inspection: Weight Check, Visual Inspection, Quality Check.

04

Heating

Temperature Controlling.

08

Machining

Machining Inspection: Visual Inspection, Dimension Check, NDE(if required) 

07

Shot Blasting

Visual Inspection

06

Heat Treatment

Heat Treatment Inspection: HT Temperature Check, HT In-process Inspection.

05

Forging

Forging Inspection: Visual Inspection, Dimension Check, NDF (if required)

09

Pre-Packaging Dispatch Inspection

Inspection (In-house, 3rd party): Visual Inspection, Marketing Check as per Work Instruction

10

Packaging & Shipping

11

After Sales Support

04

Heating